Check the booking against the delivery
Compare the machine and attachments with the confirmed order. Record the unit identifier and ask about any substitutions before accepting that the arrangement meets the scope. Check that agreed documents and operating information are available. A delivery receipt should reflect what actually arrived, including missing accessories that are expected on a later trip.
Make a useful condition record
Photograph the machine from several angles and capture existing marks or damage clearly. Include attachments, visible wear areas and the meter or fuel indication where applicable. Record the date and who attended the handover. Send observations through the supplier's agreed channel promptly; an image kept only on one person's phone can be difficult to retrieve later.
Separate familiarisation from authorisation
Ask the supplier to explain the handover and familiarisation process. Ensure the responsible site team confirms who may operate the machine and what project requirements apply. A short delivery explanation does not settle competency or task suitability. If information is missing or something appears wrong, use the site's escalation process and the supplier's support contact before work proceeds.
Set up the return record immediately
Note the hire start, included accessories, contact for faults and the off-hire notification method. Store the arrival record where the person returning the machine can find it. Agree how changes during hire will be reported. This creates a consistent record from delivery through collection instead of trying to reconstruct events at the final invoice.
- Describe the task
- Check constraints
- Confirm model
Put the decision into practice
A machine arrives while the usual site supervisor is in a meeting. A nominated alternate receives it using the booking brief. They compare the delivered model and attachments, photograph visible condition, record the meter and note a missing accessory before the driver leaves. The supplier is contacted through the agreed channel and the discrepancy is documented. The handover record does not declare the equipment safe merely because photographs were taken; it provides a clear starting record and routes technical questions to the responsible people. The team retains the delivery documentation with the hire reference for later reconciliation.
| Situation | Check this | Avoid relying on |
|---|---|---|
| Identity | Model and booked attachments | Accepting by colour or size |
| Condition | Dated images and discrepancy record | Photos without context |
| Instructions | Documents and responsible contact | Assuming everyone was briefed |
A mistake to avoid
Signing a delivery document without recording a visible discrepancy can make later discussions harder. Agree who receives the equipment and how unresolved issues are reported before the delivery window.
Example enquiry wording
Please confirm the delivery window, model, attachments and required handover documents. Our receiver is [name/phone], with [alternate]. Tell us how to report discrepancies and who can resolve a substituted or incomplete delivery before work begins.Build and download your enquiry →
Include these in your enquiry
- Unit and attachment identities
- Condition photographs
- Meter and fuel record
- Support and off-hire contacts
Use these prompts to prepare a discussion. Confirm the actual equipment, site requirements and commercial terms with your supplier and the people responsible for the work.
Practical answers before you hire
What if the delivered machine differs from the booking?
Contact the supplier and have the responsible person assess the substitute against the original requirements before use. Record the agreed outcome.
What photographs are useful at delivery?
Capture the whole machine, identification, meter and any visible damage or missing items, with the hire reference and date retained alongside them.
Should a substitute be accepted immediately?
Check it against the agreed task, dimensions and attachments first. Escalate any difference before putting it into use.
Does a handover checklist replace inspection?
No. It organises the record and questions; required checks and competent assessment remain separate responsibilities.
Sources and editorial method
How AI assistance, sources and editorial examples are used · Report a correction
Prepared by Machinery Hire Directory. Source checked 24 September 2026. Scenarios, comparison prompts and enquiry examples are original editorial illustrations; they are not reports of completed projects or supplier quotations.
Safe Work Australia — plant and machinery ↗
The linked source provides background. Supplier terms apply to that supplier, and model guidance does not replace the applicable local requirements or equipment documentation. No independent technical reviewer is claimed.