A clearer brief. A fairer comparison.
Prepare the same scope for each supplier, separate known costs from unanswered questions and keep a copy for your project.
- Align the scope
- Add known costs
- Resolve blanks
Your entries stay in this browser tab. Nothing is sent to suppliers or saved after a reload. Download a copy before leaving.
Compare two hire quotes
Use the same machine scope and chargeable period. Enter 0 only for a confirmed included or zero-cost item; leave unknowns blank. Attachments, operator, fuel and other costs are totals for the full period. This simple calculator does not model tiered or weekly rates.
No tax is calculated. Ask suppliers for the same basis before comparing.
Tax basis unresolved: these figures are not yet comparable.
Build a supplier enquiry
Complete the fields you know. The downloaded brief marks blanks as “To confirm” so assumptions remain visible. Attach measured sketches and photographs separately when you send it.