Write down who does the work
Wet hire commonly includes an operator; dry hire commonly supplies the machine without one. Those labels do not settle every responsibility. Ask what the actual offer includes, who supervises the work and how shift coverage is arranged. If your own operator will use the machine, confirm their familiarity and the site-specific requirements before committing to the booking.
Allocate operating inputs explicitly
Fuel, daily checks, servicing, attachments and transport may be treated differently by different suppliers. Create a responsibility table and ask each party to confirm its tasks. Record who calls for maintenance and what happens when a fault appears. Keep contract interpretation with the appropriate adviser where terms are unclear; the directory does not decide liability.
Compare the productive shift
A dry hire rate without labour is not comparable to an operated hourly rate. Include your own operator cost, mobilisation, supervision and expected utilisation when assessing the alternatives. Ask about minimum shifts and travel time for operated work. For intermittent tasks, discuss whether the operator can be scheduled around the project sequence instead of assuming continuous availability.
Plan for absence and change
Record the backup arrangement if an operator is unavailable or the work extends beyond the booked period. Ask whether a replacement operator or machine requires a fresh induction. Document who can approve extra hours. A clear escalation path is particularly useful when work happens outside the office hours of the person who placed the order.
- Align the scope
- Add known costs
- Resolve blanks
Put the decision into practice
A small contractor has equipment experience but no confirmed operator for the intended dates. It requests a dry-hire option and an option including an operator for the same task and hours. The wet-hire enquiry asks about minimum shifts, travel, supervision interfaces and overtime. The dry-hire enquiry identifies who will operate the machine and what the supplier needs to confirm about that arrangement. Both options include transport and attachments. The decision is then based on who can deliver the task under a clear allocation of responsibilities, not on comparing an hourly operator package with a bare machine day rate.
| Situation | Check this | Avoid relying on |
|---|---|---|
| Operator included | Hours, minimums and travel | Assuming unlimited work |
| Equipment only | Named operator and responsibilities | Ignoring staffing cost |
| Changing scope | Who approves extra time | Unpriced verbal variations |
A mistake to avoid
The words wet hire and dry hire do not define every commercial or site responsibility. Ask for a written inclusion list and clarify who provides supervision, fuel, daily checks and any required site induction.
Example enquiry wording
Please quote [task] for [hours/dates] with and without an operator where offered. State minimum hours, travel, overtime, fuel, attachments, transport and site responsibilities. Identify the information needed about the proposed operator and work environment.Build and download your enquiry →
Include these in your enquiry
- Operator and supervision
- Fuel and routine checks
- Minimum shifts and travel
- Replacement and extension process
Use these prompts to prepare a discussion. Confirm the actual equipment, site requirements and commercial terms with your supplier and the people responsible for the work.
Practical answers before you hire
Does wet hire always include fuel?
No universal inclusion should be assumed. Ask the supplier to list fuel, travel, attachments and other inputs in the written quote.
Does wet hire include fuel?
Not necessarily. Ask the supplier to list fuel, travel, overtime and other inclusions explicitly.
Is dry hire suitable for a first-time operator?
Do not assume suitability. Discuss competency, training and site requirements with the responsible people before booking.
How do I compare an hourly and daily quote?
Use the same task, realistic working period and minimum-charge rules, then include all staffing and transport costs.
Sources and editorial method
How AI assistance, sources and editorial examples are used · Report a correction
Prepared by Machinery Hire Directory. Source checked 24 September 2026. Scenarios, comparison prompts and enquiry examples are original editorial illustrations; they are not reports of completed projects or supplier quotations.
Safe Work Australia — plant and machinery ↗
The linked source provides background. Supplier terms apply to that supplier, and model guidance does not replace the applicable local requirements or equipment documentation. No independent technical reviewer is claimed.