Plan the operation, not a shopping list.
A coordinated bulk cut and fill package begins with measurable production and programme needs. Break the work into activities, identify which machine feeds or constrains the next, and define the information handover between operators. This reveals whether an apparently low individual rate creates idle time elsewhere.
Specific inputs for this package
Separate excavation, loading, trimming and haulage. Excavator reach, loader travel cycles and truck availability can each constrain output; identify the slowest part of the operation before adding machines.
- Material type and quantity
- Digging depth and spoil location
- Haul distance and truck interface
- Machine width and tail swing
Information to issue.
Make interfaces priceable.
Request the base rate and minimum hours for every fleet element, then separate transport, attachments, operators, fuel, overtime, standby and demobilisation. Identify which supplier controls coordination and how delay caused by another fleet element will be treated.