A coordinated remote site compound package begins with measurable production and programme needs. Break the work into activities, identify which machine feeds or constrains the next, and define the information handover between operators. This reveals whether an apparently low individual rate creates idle time elsewhere.
Specific inputs for this package
Plan the compound around people, utilities and servicing access. Offices, amenities, storage and welfare facilities need coordinated placement and connection arrangements. Ask who supplies setup, connection and ongoing servicing rather than treating the unit hire as the entire scope.
Occupancy and duration
Compound plan and delivery access
Power, water and servicing interfaces
Relocation and collection sequence
INPUT MATRIX
Information to issue.
□ Quantities, material and production target□ Site plan, access and haul paths□ Working hours and programme windows□ Machine capacities and critical tolerances□ Operators, spotters and supervision□ Fuel, maintenance and field support□ Mobilisation and staging sequence□ Standby, weather and recovery plan
COMMERCIAL STRUCTURE
Make interfaces priceable.
Request the base rate and minimum hours for every fleet element, then separate transport, attachments, operators, fuel, overtime, standby and demobilisation. Identify which supplier controls coordination and how delay caused by another fleet element will be treated.
Does facility hire include installation and services?
Inclusions vary. Confirm delivery, placement, connections, cleaning, servicing and removal separately, and allocate responsibilities in the booking.
How should I compare a combined fleet quote?
Request each machine, operator, attachment and transport item separately, then record coordination, standby and sequencing assumptions. Compare the same output and work window across offers.