P-06 / PROCUREMENT CONTROL

Control attachments and substitutions

Prevent a technically similar replacement from undermining output, clearance, lift or ground-pressure requirements.

Why this control matters

Machinery hire decisions become difficult to compare when requirements remain implied. This protocol creates a compact evidence trail: what the project needs, what the supplier has offered, what remains to be confirmed and who owns the next decision.

Control sequence

  1. 01

    List mandatory attachments

    Put the exact attachment requirement beside the proposed machine in the enquiry. Include task, dimensions and material information. Ask the supplier to confirm the coupling, hydraulic and operating compatibility for that specific combination.

  2. 02

    Define acceptable tolerance

    Identify which requirements can vary and which are mandatory. Describe the minimum result and maximum access envelope instead of saying any equivalent is acceptable. Require the supplier to explain differences that affect productivity, interfaces or operation.

  3. 03

    Approve substitutions before dispatch

    Name the person authorised to assess an alternative. Recheck machine dimensions, attachments, operating requirements and commercial terms before dispatch. Send the approved change to the site receiver so the delivery can be checked against the current order.

  4. 04

    Reconfirm transport dimensions

    Ask whether the replacement changes weight, delivery vehicle, loading or unloading arrangements. Update the access brief and transport price where necessary. A machine with more nominal capacity may introduce a larger footprint that the original plan did not allow.

Evidence to retain

Keep the issued scope, supplier response, machine details, agreed substitutions, pricing schedule and approval record together. A short written trail protects both the project team and supplier when plans change.

Practical answers before you hire

When should I use “Control attachments and substitutions”?

Use this control when preparing or reviewing the relevant part of your hire arrangement. Start with: list mandatory attachments. Keep the supplier response and unresolved items with the booking.

What if the supplier changes the arrangement?

Record the change and have the responsible person reassess the affected scope, equipment and terms. Send the approved version to the people receiving the machinery.