A coordinated structural lifting package begins with measurable production and programme needs. Break the work into activities, identify which machine feeds or constrains the next, and define the information handover between operators. This reveals whether an apparently low individual rate creates idle time elsewhere.
Specific inputs for this package
Prepare a load and site brief for the crane supplier and the people responsible for lift planning. Include documented load information, pickup and placement positions, access and available setup space. An advertised maximum capacity is not a lift plan.
Load weight and dimensions
Pickup and placement positions
Setup footprint and access
Programme and supporting personnel
INPUT MATRIX
Information to issue.
□ Quantities, material and production target□ Site plan, access and haul paths□ Working hours and programme windows□ Machine capacities and critical tolerances□ Operators, spotters and supervision□ Fuel, maintenance and field support□ Mobilisation and staging sequence□ Standby, weather and recovery plan
COMMERCIAL STRUCTURE
Make interfaces priceable.
Request the base rate and minimum hours for every fleet element, then separate transport, attachments, operators, fuel, overtime, standby and demobilisation. Identify which supplier controls coordination and how delay caused by another fleet element will be treated.
Is the crane's maximum capacity enough to choose a machine?
No. The intended configuration, radius, site conditions and lift plan must be assessed by the responsible qualified people using the proposed equipment information.
How should I compare a combined fleet quote?
Request each machine, operator, attachment and transport item separately, then record coordination, standby and sequencing assumptions. Compare the same output and work window across offers.